
How to Build a Stitch and Glue Kayak - Free Building Videos and Instruction
Nick Schade and his friend Bill put together a Petrel Play SG Kit from Chesapeake Light Craft and kept a camera running the whole time. Below is the Complete Series. You can click on the Episode Title to watch each video, or click on the time stamp to get the information you need.
VIDEO CHAPTER INDEX
E1- BUILD YOUR OWN ADVENTURE: THE PETREL PLAY SG KAYAK
- 0:18 Launching the Petrel Play SG
- 4:27 Design Discussion - What features
- 8:00 Design History - What lead up to this design
- 12:48 Petrel - How it compare to earlier designs
- 15:19 Petrel SG - How it compares to the Strip Built version
- 20:48 Wood Kayak Durability - Is it good enough to make a kayak?
- 23:47 Why the Petrel Play?
E2 - UNBOXING THE KAYAK KIT - STITCH AND GLUE PETREL PLAY
- 0:51 Introduction to the unboxing of the kit
- 2:45 What is in The Epoxy Box
- 6:23 Opening the Big Box
- 8:15 Fiberglass Tape
- 8:57 The Builder's Manual
- 9:45 Looking at the Stitching Wire
- 10:22 Discovering the Hatch Rims
- 11:05 Discussing the roll of Fiberglass Cloth
- 12:25 Identifying Parts and Pieces
- 14:06 Finding the Bottom Panels
- 16:40 Sorting out the Deck Sides
- 18:53 Differentiating the Hull and Deck Forms
- 20:08 Finding the Cockpit Parts
- 22:21 Distinguishing the Hatch Parts
- 25:38 The Benefits of Pre-Beveled Plywood Panels
E3 - STAINING THE PANELS - STITCH AND GLUE PETREL PLAY
- 0:23 Episode Introduction
- 2:13 Example of a Stained Kayak
- 2:59 Finding the Parts to be Stained
- 5:18 Selecting the Stain
- 9:27 Applying the Stain
- 12:10 Eliminating Blotchiness in the Stained Panels
- 15:15 Introduction to Mixing Epoxy
- 25:25 Introduction to Applying Epoxy
EPISODE 4.1 — 4.4 - PUTTING TOGETHER THE HULL OF THE S&G KAYAK
E4.1 - ASSEMBLING THE HULL PANELS ON A STITCH AND GLUE KAYAK - PETREL PLAY SG BUILD
- 0:20 Introduction
- 0:40 Identifying the Hull Parts
- 4:14 Fitting the First Bottom Puzzle Joints
- 5:39 Introduction to Using CyanoAcrylate (CA) Glue
- 7:26 Using CA Glue to Spot Welding Puzzle Joints
- 17:55 Assembling the Side Panels
- 23:05 Discussion on Assembling the Hull
E4.2 - SETTING UP THE HULL ON A STITCH AND GLUE KAYAK - PETREL PLAY SG BUILD
- 0:21 Introduction to Setting Up the Panels into a 3D Hull Shape
- 2:21 Start Assembling The Panels
- 2:42 Cutting the Copper Stitch Wires to Length
- 4:43 Safely Picking up and Moving the Freshly Assembled Panels
- 5:42 Installing Stitching Along Bottom Keel Line
- 11:40 Installing The First Forms
- 15:37 Opening Bottom Two Panels Like a Book
- 20:43 Stitching on the Side Panels
- 21:59 Drop the Side Panels Into the Forms
- 24:36 Installing the Remaining Forms
- 27:49 Installing Narrow Stealer Plank at the Bow of the Hull
E4.3 - STITCHING THE HULL ON A STITCH AND GLUE KAYAK - PETREL PLAY SG BUILD
- 0:20 Introduction To Stitching Together the Plywood Hull Panels
- 3:00 Start to the Stitching with Copper Wires
- 4:28 Removing the CNC Tabs
- 7:41 How to Tighten the Copper Wire Stitches So They Are Tight But Don't Break
- 16:20 What is Good vs Poor Wiring
- 19:48 Closing up Bow Seam
- 29:50 Outro to Stitching
E4.4 - MAKING KAYAKS WITH SUPERGLUE - PETREL PLAY SG BUILD
- 0:16 Introduction to Spot Welding using CA Glue
- 3:03 Aligning the Seams Before Gluing
- 4:13 Spot Welding Seams with CyanoAcrylate (CA) Glue
- 10:25 Aligning the Seams at the Ends
- 14:26 Recap of Assembling the Hull
E5 - EPOXY FILLET FUNDAMENTALS ON A STITCH AND GLUE KAYAK - PETREL PLAY SG BUILD
- 0:11 Introduction to Filleting
- 1:25 Bill's Reaction to Paddling the Petrel Play
- 10:33 Pulling out the Copper Wire Stitches
- 16:30 What are Fillets and Why Do We Use Them
- 20:29 Epoxy Mixing Cups
- 25:20 How to Make the Epoxy/Wood Flour Filleting Mix
- 29:39 How to Dispense the Filleting Mix
- 35:15 Shaping the Fillets
- 47:26 Smoothing Messy Fillets with Alcohol
- 49:00 Filleting the Stems
- 56:00 Outro
E6 - THE ART OF KAYAK INTERIOR FIBERGLASS: A DETAILED HOW-TO GUIDE - PETREL PLAY SG BUILD
- 0:14 Introduction to Fiberglassing
- 1:44 When is the Best Time to Fiberglass
- 3:38 Layout and Cut the Fiberglass Cloth
- 8:42 Getting Prepared to do the Fiberglassing
- 9:40 Introduction to Applying Epoxy
- 10:48 What is Bridging and How Do We Deal With It?
- 17:38 When to Add More Epoxy
- 22:19 Working in the Tight Ends of the Hull
- 26:40 How to Do "Grunge Cupping" Removing Excess Epoxy
- 45:23 Wrap Up
E7 - FILL COAT, PUZZLE JOINTS, & FIXING MISTAKES - BUILDING PETREL PLAY SG
- 00:31 Introduction To Fill Coats
- 2:38 Trimming the Hardened Fiberglass Edge
- 4:12 Dealing with Edge Bubbles
- 6:13 Applying an Interior Fill Coat
- 10:24 Assembling the Deck Parts
- 11:34 Fitting the Puzzle Joints
- 12:41 Spot Welding Puzzle Joints
- 14:45 Finding a Mistake And Dealing With It.
- 16:05 Disassembling a Mis-glued Puzzle Joint
- 17:38 Discussion About Dealing With Mistakes
- 19:35 Cleaning up the Fixed Joint
- 21:37 Test Fit
- 27:49 Outro
E8 - HEAT, BEND, ASSEMBLE: A DEEP DIVE INTO S&G KAYAK HATCH CONSTRUCTION - PETREL PLAY SG
- 0:13 Introduction To Assembling the Deck
- 3:00 Identifying the Deck Parts
- 4:06 Stitching Together the Deck Bow
- 6:12 Stitching Front Deck to the Form
- 8:04 Removing Epoxy Messes
- 9:20 Attaching The Rear Deck to Form
- 11:04 Installing The Deck Sides on Forms
- 11:57 Stitching The Sides into Forms
- 11:55 Setting up The End Panels
- 16:59 Stitching up The Cockpit Recess
- 25:06 Starting to Assemble the Hatch Recesses
- 27:26 Gluing Together the Hatch Recess Parts
- 28:22 Reinforcing The Hatch Recess
- 29:50 Using Heat to Shape Plywood Hatch Parts
- 30:47 Closing The Hatch Recess
- 39:22 Fitting The Hatch Ring
- 55:14 Wrap Up to Assembling the Hatches
E9 - CRAFTING THE PERFECT KAYAK DECK: STITCHING AND GLUING MASTERY - PETREL PLAY BUILD
- 0:19 Introduction To Creating the Kayak Deck
- 2:41 Why the Recessed Hatches?
- 4:00 Where Do the Hatches Go?
- 5:54 Beveling the Recessed Hatches
- 7:30 Fitting the Cockpit Pieces
- 14:40 Fitting the Back Hatch Recess
- 15:24 Adjusting Bevel Angle
- 18:39 Fitting the Front Hatch Recess
- 18:59 Adjusting the Front Hatch Bevel
- 26:40 Recap on Assembling the Deck
- 29:00 Surfing through Sea Gulls
E10 - WIRING AND SPOTWELDING THE DECK - PETREL PLAY SG
- 0:00 - Introduction and Project Overview
- 0:35 - Current State of Deck Assembly
- 1:02 - Process Overview for Deck Assembly
- 1:43 - Addressing Cockpit Combing Alignment
- 4:59 - Working on the Deck Seams
- 13:02 - Maintaining Panel Fairness and Form Alignment
- 18:03 - Focus on Front Deck and Hatch Assembly
- 31:47 - Conclusion and Next Steps
- 32:15 - Behind the Scenes Insights
- 34:13 - Outro and Channel Information
E11 - CREATING FLAWLESS FILLETS - PETREL PLAY SG
- 0:17 Introduction to Filleting the Deck
- 4:06 Pulling the Stitch Wires
- 5:05 Dealing with Twist in the Panels
- 5:46 Intro to Filleting with Epoxy and Wood Flour
- 6:10 Sanding the Interior
- 7:03 Discussion on Filleting Tools
- 14:54 Making Filleting Mix from Epoxy and Wood Flour
- 16:04 Judging Proper Filleting Mix Thickness
- 17:54 Piping Mix onto the Seams with a Cake Bag
- 20:03 Shaping the Fillets
- 33:57 Mistakes in Mixing Epoxy
- 35:59 Fillets around the Hatches
- 39:11 Touching up Missed Spots
- 38:19 Judging Proper Fillet Size
- 39:43 Cleaning up the Fillets
- 45:56 Front Hatch Finger Divots
E12 - MASTERING FIBERGLASS APPLICATION: KAYAK INTERIOR BUILD TECHNIQUES - PETREL PLAY SG
- 0:00 Preview
- 1:15 Overview of the Kayak Kit and Design
- 1:48 Previous Episode Recap and Current Project Stage
- 2:23 Sanding Process and Surface Prep
- 4:00 Epoxy and Fiberglass Safety Measures & Respirators
- 7:17 Sanding Demonstration and Further Safety Tips
- 10:07 Glassing the Interior - Introduction and Planning
- 11:51 Examining Glass Options and Application Techniques
- 14:47 Preparation for Glassing the Stern
- 15:58 Discussion on Bridging and Epoxy Mixing
- 17:57 Applying Epoxy With a Roller and Squeegee
- 26:02 Addressing Dry Spots and Bridging
- 28:55 Introduction to Epoxy Application
- 30:23 Identifying Areas Needing Attention
- 31:46 Using a Squeegee
- 34:07 Dealing With Bridging
- 38:41 Grunge Cup to Remove Excess Epoxy
- 42:24 Comparing the Roller to the Dump & Spread Method
- 45:01 Demonstrating the Grunge Cup Technique
- 47:06 Reviewing the Final Result
- 49:12 Rationale Behind Using Fiberglass and Epoxy
E13 - STITCH & GLUE KAYAK HULL PREPARATION: SHAPING SEAMS & STEMS FOR FIBERGLASSING - PETREL PLAY SG
- 0:14 Introduction to this Episode
- 2:09 Demonstrating Fiberglass Trimming Technique
- 3:40 Handling Non-Wetted Fiberglass and Holes
- 4:24 Organizing Workspace After Trimming
- 5:05 Emphasizing Low-Cost Equipment for Kayak Building
- 5:21 Inspecting the Hull Assembly
- 6:01 Removing Forms from the Hull
- 7:05 Addressing Sharp Edges and Drips on the Hull
- 10:58 Prepping for Fiberglassing the Hull's Exterior
- 20:32 Discussing Craftsmanship Details and Adjustments
- 37:19 Clean Up the Chines
- 50:48 Stain Correction & Preparation for Fiberglassing
- 1:00:31 Conclusion
E14 - MASTERING KAYAK FIBERGLASSING: TIPS AND TRICKS - PETREL PLAY SG
- 00:23 Introduction
- 00:29 Overview of the Fiberglassing Process
- 00:35 Preparing the Hull for Glass
- 01:05 Filling the Stem Gap
- 01:58 Begin Fiberglassing
- 03:03 Strategy for Glassing the Outside Compared to the Inside
- 07:03 Working on the Stem
- 15:01 Additional Finishing Steps
- 30:25 Fill Coat Application After a Partial Cure
E15 - HANDCRAFTING A KAYAK: GLASSING COMPONENTS FOR PROTECTION AND STRENGTH - PETREL PLAY SG
- 1:04 Bulkheads and Cheek Plates Explanation
- 1:21 Combing Ring and Skeg Kit Overview
- 2:23 Preparing Small Parts for Fiberglass Application
- 3:27 Applying Epoxy and Fiberglass
- 6:02 Ensuring Complete Saturation with Epoxy
- 7:13 Additional Epoxy Application Tips
- 8:49 Working on Small Assembly Projects
- 10:50 Trimming and Preparing the Hull
- 12:12 Coaming Riser Assembly Process
- 16:13 Applying Epoxy for Coaming Riser Assembly
- 18:21 Clamping and Aligning Coaming Riser Layers
- 19:13 Epoxy Application for Final Layers
- 22:29 Preparing for Fiberglassing Other Components
- 31:09 Applying Glass to Other Components & Using Peel Ply
- 36:16 Closing Remarks and Future Plans
E16 - SKEG PARTS AND END POUR - PETREL PLAY SG
- 0:00 Introduction
- 1:38 Skeg Box Construction
- 2:19 Purpose of a Skeg on a Kayak
- 6:57 Control Slot Construction
- 11:30 Shaping the Kayak Skeg Fin
- 19:38 Reinforcing the Skeg Pivot Hole
- 21:17 Preparing Skeg Spacers
- 24:48 Skeg Trailing Edge Reinforcement
- 26:39 End Pour Using a Dam Technique
- 30:44 Mixing and Applying Epoxy
- 33:42 Discussion on Usefulness of Kayak Skegs
E17 - THINKING AHEAD ON THE STITCH-AND-GLUE KAYAK - PETREL PLAY SG
- 0:00 Introduction and Overview
- 2:07 Removing End Pour Dams
- 2:27 Drilling Holes for Carrying Toggles
- 6:04 Removing Peel Ply from Fiberglassed Parts
- 10:04 Where to Get Good Paint Scrapers
- 11:07 Trimming Fiberglass from Parts
- 14:14 Marking and Drilling Holes for Skeg Control Knob
- 17:33 Drilling Holes in Skeg Control Box
- 20:17 Preparing Coaming Riser
- 22:54 Cleaning Up Coaming Riser Surface
- 25:23 Gluing Together Skeg Box
- 28:07 Mixing Epoxy for Filling Holes
- 30:09 Thickening Epoxy for Gluing Parts
- 32:31 Clamping Skeg Box and Letting it Cure
- 33:07 Gluing Coaming Lip to Riser
- 35:14 Changing Order of Operations
E18 - MAKING INTERIOR SYSTEMS - PETREL PLAY SG
- 00:00 Introduction and Overview
- 00:58 Installing the Skeg Box
- 03:07 Drilling the Control Knob
- 03:21 Rounding Skeg Box Edges
- 06:42 Inserting the Skeg Pivot Pin
- 07:59 Sanding the Skeg Box
- 08:36 Preparing the Skeg
- 10:54 Measuring and Drilling Holes
- 16:30 Shaping the Control Knob
- 18:46 Shaping the Cable Hook
- 19:04 Sanding the Control Knob
- 20:44 Glassing the Control Knob Slot
- 27:49 Concluding Remarks
E19 - INSTALLING THE SKEG BOX, CONTROL SLOT & CHEEK PLATES - PETREL PLAY SG
- 0:00 Intro and Overview
- 0:41 Installing Skeg Box and Control Slot
- 2:00 Preparing to Install Control Slot
- 3:28 Mounting Skeg Box Location
- 5:03 Skeg Box Cable Routing
- 6:04 Drilling Hole for Skeg Box
- 6:35 Cleaning and Prepping Skeg Box
- 7:54 Stitch Hole Locations on Skeg Box
- 8:10 Skeg Cable Entry Point
- 9:31 Drilling Hole for Barb Fitting
- 10:42 Marking and Cutting Skeg Box Opening
- 12:19 Fitting Skeg Box into Hull
- 13:04 Positioning and Clamping Skeg Box
- 13:37 Gluing Skeg Box in Place
- 15:01 Installing Control Slot
- 18:59 Applying Epoxy to Control Slot
- 19:52 Glassing Control Slot
- 21:01 Prepping Skeg Box for Glassing
- 22:03 Applying Fillet and Glassing Skeg Box
- 25:19 Installing Barb Fitting in the Skeg Box
- 26:05 Aligning Control Slot Tubes
- 27:12 Checking Alignment
- 28:05 Installing Cheek Plates
- 30:00 Glassing Cheek Plates
- 32:41 Completing Interior Systems
E20 - MATING THE DECK AND HULL - PETREL PLAY SG
- 0:00 Welcome to the Workshop
- 0:29 Preparing the Deck and Hull
- 2:11 Cleaning the Sheer Line
- 6:45 Sanding the Interior
- 10:31 Preparing the Hull
- 15:17 Joining the Deck and Hull
- 25:10 Leveraging the Tape Dispenser to Make a Tight Joint
- 34:03 Utilizing a Putty Knife To Fit a Misaligned Seam
E21 - PRECISION SEAM TAPING - PETREL PLAY SG
- 0:00 Introduction to the workshop
- 0:25 Preparing to run fiberglass tape
- 0:50 Sealing the seam with tape
- 1:58 Preparing the fiberglass tape
- 2:43 Laying out the fiberglass tape
- 6:22 Applying epoxy to the fiberglass tape
- 10:50 Unrolling and applying the fiberglass tape
- 16:07 Completing the fiberglass tape application
- 22:53 Wrapping up and looking ahead
E22 - PREPPING A KAYAK DECK FOR FIBERGLASS- PETREL PLAY SG
- 0:00 - Introduction and Context
- 0:24 - Preparing the Deck for Glassing
- 1:10 - Removing Tape and Rounding Edges
- 2:00 - Rounding Deck Chines and Joints
- 6:06 - Adjusting Deck-Hull Joint and Touching Up the Stain
- 10:13 - Rounding Cockpit Recess and Hatches
- 13:32 - Smoothing Ends and Creating Thumb Hole
- 16:13 - Sanding and Scuffing Deck-Hull Joint
- 19:07 - Adjusting Sharp Angles and Overhangs
- 27:23 - Refining Edges and Seams
- 36:05 - Final Surface Preparation
E23 - FIBERGLASSING THE DECK - PETREL PLAY SG
- 0:00 - Introduction
- 0:50 - Preparing the Skeg Control Slot
- 2:36 - Touching up Wood Stain
- 4:20 - Applying Protective Tape for Fiberglassing
- 5:58 - Mixing Epoxy and Fiberglass Application
- 15:05 - Challenges with Fiberglass Cloth Tension
- 19:23 - Resolving Fiberglass Wrinkles and Bridging
- 25:27 - Applying Fill-Coats and Trimming
- 32:19 - Installing Deck Combing and Clamping
- 38:39 - Outro and Additional Filling/Trimming
E24 - CLEANING UP CHINES AND EDGES - PETREL PLAY SG
- 0:00 - Introduction and Overview
- 0:23 - Explaining the Petrel Play Boat Kit
- 0:38 - Removing Masking Tape and Cleaning Deck
- 1:13 - Preparing the Combing for Glassing
- 3:50 - Removing Clamps and Cleaning the Combing
- 6:44 - Rounding Over Edges of the Combing
- 9:00 - Sanding and Feathering the Combing
- 11:07 - Addressing Bubbles and Imperfections
- 13:34 - Preparing Hatch Recess Area
- 18:54 - Sanding Deck and Combing
- 21:23 - Trimming Off Bottom of the Skeg Box
- 25:41 - Preparing Skeg Box Area
- 27:16 - Prepping Hull for More Glassing
E25 - THE WONDERS OF BIAS CUT GLASS - PETREL PLAY SG
- 0:00 - Introduction
- 1:02 - Preparing Fiberglass Strips For Difficult Shapes
- 5:04 - Cutting and Handling Bias Cut Strips
- 6:37 - Applying Fiberglass to the Combing
- 10:05 - Wrapping Fiberglass Cloth around the Combing
- 26:04 - Applying Fiberglass around the Skeg Box
- 31:00 - Future Plans for the Build
- 34:09 - Understanding the Video Series
E26 - SANDING AND LEVELING A STITCH-AND-GLUE KAYAK - PETREL PLAY SG
- 0:00 - Introduction and Fairing Overview
- 0:57 - Sanding and Leveling Process
- 6:03 - Dealing with Big Drips and Mighty Bumps
- 13:22 - Sanding the Boat Deck
- 22:37 - Preparing for the Fill Coat
- 27:26 - Sanding the Skeg Slot Area
- 35:02 - Masking and Preparing for Fill Coat
- 39:04 - Applying the Fill Coat Technique
- 45:03 - Wrapping Up and Next Steps
E27 - DECK HARDWARE - WHY DRILL HOLES IN A GOOD KAYAK? PLUS SANDING - PETREL PLAY SG
- 0:00 - Introduction and Overview
- 0:52 - Cleaning Up Drips from Previous Coat
- 4:46 - Sanding Process to Level Surface
- 16:32 - Achieving a Uniform Scratch Surface
- 23:13 - Prepping for Deck Lines Installation
- 27:46 - Drilling Holes for Deck Line Mounts
E28 - A BEAUTIFUL VARNISH FINISH DEPENDS ON PREP WORK - PETREL PLAY SG
- 0:00 - Introduction to Varnishing
- 0:21 - Sanding Material Preparation
- 10:03 - Finish Sanding Techniques and Tips
- 19:21 - Preparing for Varnishing
- 40:46 - Applying the Varnish Coat
- 51:23 - Varnishing Techniques and Reflections
E29 - THE LAST COAT: FINISH VARNISHING A STITCH AND GLUE KAYAK - PETREL PLAY SG
- 0:00 - Introduction and project context
- 1:34 - Preparing for final varnish coat
- 3:45 - Dealing with varnish drips and leveling
- 6:42 - Sanding techniques and considerations
- 11:00 - Preparing for varnish application
- 14:30 - Applying varnish to the deck
- 18:13 - Varnishing the hull
- 22:28 - Brushing techniques for beautiful varnishing
- 23:38 - Conclusion and next steps
E30 - INSTALLING HATCHES & BULKHEADS - PETREL PLAY SG
- 0:00 - Introduction and episode overview
- 0:52 - Preparing to install bulkheads and hatches
- 2:42 - Fitting the rear oval hatch ring
- 6:38 - Preparing the rear bulkhead
- 9:31 - Fitting the rear bulkhead
- 12:03 - Fitting the front bulkhead
- 16:55 - Installing bulkheads with epoxy fillets
- 22:22 - Gluing hatch rings with Gflex
- 30:37 - Conclusion and future steps
E31 - INSTALLING AND OUTFITTING - SKEG, SEAT, DECKLINES - PETREL PLAY SG
- 0:00 - Introduction to this Episode
- 0:53 - Installing the skeg control system
- 5:17 - Mounting the seat and backrest
- 18:52 - Installing kaykak foot pegs
- 22:23 - Creating deck lines and perimeter lines
- 33:45 - Installing the skeg mechanism
E32 - LAUNCHING OUR WOOD KAYAK - PETREL PLAY SG
Thanks for Watching and Happy Paddling